PACE OF NORTHCOTE
This contemporary project designed by Pace Developments included over 12,000m2 of Formwork. With strict project scheduling, MACARD built was able to not only reach the builders requirements but exceed. Formwork tables were engineered to maximize deliveries on site and systemise the works required. Double stack pre cast columns was also implemented for this project which sped up pour cycles.
![]() | ![]() | ![]() | ![]() | ![]() |
---|